The First Sections of Pipe

The Alaska Maru

On this date in 1969, the first shipment of pipe for the Trans-Alaska Pipeline landed in Valdez, Alaska. On board the Alaska Maru was enough pipe for 8.6 miles of the proposed 800 mile pipeline. There were 1160 sections of 40 foot long pipe, weighing 5 tons each.

Alaska received on average, three shipments a month from Japan. It took ten days for the pipe to travel from Japan to Alaska. The first 300 miles were unloaded at Valdez, and 500 miles to Seward, Anchorage and “other” ports in the state for distribution along the line. The final 150 miles of pipe were trucked up the Haul Road to Prudhoe Bay.